Implementing centralized operating mechanism for FRUIT PULP EXTRACTION PLANT to completely eradicate conventional method of distributed manual control.
Softcon Automation Scope :
• Design & engineering of control panel.
• Application development for HMI and controller.
• Testing & Commissioning.
• Application development for HMI and controller.
• Testing & Commissioning.
System Description :
Controllogix L71 PAC communicating with distributed Remote Flex IO system at four locations.
Network architecture protocol: Ethernet/IP (Industrial Ethernet).
HMI package: Panelview plus 1500, windows CE at local and remote station each for:
Network architecture protocol: Ethernet/IP (Industrial Ethernet).
HMI package: Panelview plus 1500, windows CE at local and remote station each for:
Operational interface |
|
Real time monitoring |
|
Historical Trends |
|
Data-logging for PREHEATER temperature and pressure. |
Project Description :
Four production lines; each line production capacity of 15 ton pulp. |
||
Parallel production, with provisioning of INTERLINE CROSS between enlisted stages of any particular line. |
||
Provisioning operator to generate for around more than 1500 combination to be commissioned for. |
||
Process stages: | ||
• | Dumping | |
• | Preheating | |
• | Pulping & extraction | |
• | Standardization | |
• | Decanting | |
• | Balancing | |
• | Sterilization requirement | |
Data logging provision for Preheater parameters up to maximum storage around 20 days. | ||
Historical trends up to max buffer data stored for 10 days on windows CE environment. | ||
Phase wise automation with considering major part able to operate on conventional manual mode. |
|
Logic development and testing in running batch process. |
|
Narrow testing time band considering safety for running equipments. |
|
Fool proof commissioning at single shot to ensure every phase undertaken for automation is ready for immediate production. |
|
Project Accomplishments :
Complete project commissioning and testing achieved as per process requirement. |
|
Complete utilization, enhanced productivity, exclusion of specific equipment of plant machineries achieved by INTERLINE CROSS application. |
|
Reduction in large number of operator presence during production with the process monitoring and supervision harbored optimum level. |